Our Track Record

Refinery upgrade works:
Engineering, Fabrication & Construction:
1- Road Access (inside the station)
2-Piping Works:
A- Fabrication & Welding (300,000 Dia/in).
B- NDT, PMI, Hardness Test, PWHT& Hydro test.
C- Flange Management & Torquing.
D- Painting & Insulation.
3-Mechanical works (Plant
equipment, Compressors,
Towers, UG & AG Pipelines).
4-Civil works.
5- E&I works (Extension of cables, FOC, Control Valves, pre-commissioning of all instruments, CCTV, Lighting ..etc.).
6- QA/QC Works (all required tests and inspection).
7- Steel Structure (QTY: 4,000 Ton)
8- Engineering, Fabrication & Construction of 32 Tanks:
A- # Dome Roof: 3 (10,000 M³), 2 (5,000 M³), 4 (3,000 M³), 2 (27,500 M³), 2 (2,000 M³), 4 (400 M³), & 1 (800 M³).
B- # Floating Roof: 2 (10,000 M³), 2 (27,500 M³) & 6 (5,000 M³).

Show More